Skip to product information
1 of 7

Heavy Duty Nylon Dog Leash – Long Leads for Running, Tracking & Training

Heavy Duty Nylon Dog Leash – Long Leads for Running, Tracking & Training

Regular price $13.99 USD
Regular price $0.00 USD Sale price $13.99 USD
Sale Sold out
Shipping calculated at checkout.
Color
Size

Keep control of your dog during walks, training, or running sessions with this durable nylon dog leash. Available in lengths from 3m to 20m, this long leash is perfect for giving your dog the freedom to roam while ensuring their safety and your control. Designed for medium and large breeds, this leash is built for heavy-duty use.

Key Features:

  • Durable Nylon Construction: Made from high-quality nylon, this leash is designed to be strong, durable, and resistant to wear and tear, ensuring long-lasting use even with heavy pullers.
  • Non-Slip Grip: The leash features a non-slip surface for secure handling, providing better control during runs, training sessions, or walks.
  • Long Leads for Freedom: Available in multiple lengths (3m, 5m, 10m, 20m), this leash allows your dog to explore their surroundings while keeping them safe during tracking, walking, or running.
  • Heavy Duty for Large Dogs: Ideal for medium and large dog breeds, this leash can withstand the strength and energy of active dogs.
  • Color Options: Choose from stylish neutral tones like Beige and Coffee to match your dog’s accessories.

Specifications:

  • Material: Nylon
  • Length Options: 3m (9.8ft), 5m (16.4ft), 10m (32.8ft), 20m (65.6ft)
  • Colors: Beige, Coffee
  • Applicable Breeds: Medium to large dogs

 

View full details